Daikin ATX25J2V1B Manuel d'installation

Naviguer en ligne ou télécharger Manuel d'installation pour Pompes à chaleur Daikin ATX25J2V1B. Daikin ATX25J2V1B Installation manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 18
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
INSTALLATION
MANUAL
R410A Split Series
Models
ATX20J2V1B
ATX25J2V1B
ATX35J2V1B
Deutsch
Français
Nederlands
Español
Italiano
!""#$%&Ü
Portugues
English
Installation manual
R410A Split series
Installationsanleitung
Split-Baureihe R410A
Manuel d’installation
Série split R410A
Montagehandleiding
R410A Split-systeem
Manual de instalación
Serie Split R410A
Manuale d’installazione
Serie Multiambienti R410A
!"#$%&ß'%( $")*+Ü,+*,-ò
'%*%&(ýì$.-ò ,$%&Üò R410A
Manual de Instalação
Série split R410A
Vue de la page 0
1 2 3 4 5 6 ... 17 18

Résumé du contenu

Page 1 - INSTALLATION

INSTALLATION MANUALR410A Split SeriesModels ATX20J2V1BATX25J2V1BATX35J2V1BDeutschFrançaisNederlandsEspañolItaliano!""#$%&ÜPortuguesEngli

Page 2 - Czech republic

English 84.Wiring.1) Strip wire ends (15mm).2) Match wire colours with terminal numbers on indoor and outdoor unit’s terminal blocks and firmly screw

Page 3 - Safety Precautions

9 EnglishIndoor Unit Installation5-5. Prepare the accessory (separate product) [Figure 2].1) Remove the cover from the accessory (separate product).2

Page 4 - Choosing an Installation Site

English 106.Drain piping.1) Connect the drain hose, as described right.2) Remove the air filters and pour some water into the drain pan to check the

Page 5 - Installation Tips

11 EnglishRefrigerant Piping Work2.Refrigerant piping.CAUTION1) Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by ag

Page 6 - ■English 4

English 12Trial Operation and Testing1.Trial operation and testing.1-1 Measure the supply voltage and make sure that it falls in the specified range.

Page 7

13 PortuguesMEMO

Page 9

15 PortuguesMEMO

Page 10 - Cover of the indoor unit

3P291651-2U Nove hospody 1/1155, 301 00 Plzen Skvrnany, Czech republicZandvoordestraat 300, B-8400 Ostende, Belgiumwww.daikineurope.com

Page 11 - Indoor Unit Installation

ATX20J2V1B, ATX25J2V1B, ATX35J2V1B DAIKIN INDUSTRIES CZECH REPUBLIC s.r.oLow Voltage 2006/95/ECElectromagnetic Compatibility 2004/108/EC*3P290872-2

Page 12 - Refrigerant Piping Work

1 EnglishSafety Precautions• Read these Safety Precautions carefully to ensure correct installation.• This manual classifies the precautions into WAR

Page 13

English 2Accessories – , Choosing an Installation Site• Before choosing the installation site, obtain user approval.1.Indoor unit.• The indoor un

Page 14 - Test items

3 EnglishInstallation Tips1.Removing and installing front panel.• Removal method1) Place your fingers in the indentations on the main unit (one each

Page 15 - 13 ■Portugues

English 4Indoor Unit Installation DrawingsAM4 × 16L D Wireless remote controller E Remote controller holderBefore screwing the remote controller ho

Page 16 - ■Portugues 14

5 EnglishIndoor Unit Installation1.Installing the mounting plate.• The mounting plate should be installed on a wall which can support the weight of t

Page 17 - 15 ■Portugues

English 62.Boring a wall hole and installing wall embedded pipe.• For walls containing metal frame or metal board, be sure to use a wall embedded pip

Page 18 - 3P291651-2

7 EnglishIndoor Unit Installation3-2. Left-side, left-back, or left-bottom piping. 1) Attach the drain hose to the underside of the refrigerant pipes

Commentaires sur ces manuels

Pas de commentaire