Daikin FTX50GV1B Manuel de service Page 115

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 131
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 114
SiBE041029_A
Trial Operation and Field Settings 105
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................106
2. Forced Cooling Operation ...................................................................107
3. Trial Operation ....................................................................................108
4. Field Settings ......................................................................................109
4.1 When 2 Units are Installed in 1 Room..................................................109
4.2 Facility Setting Switch (cooling at low outdoor temperature)................110
4.3 Jumper and Switch Settings.................................................................111
5. Silicon Grease on Power Transistor / Diode Bridge............................112
Vue de la page 114
1 2 ... 110 111 112 113 114 115 116 117 118 119 120 ... 130 131

Commentaires sur ces manuels

Pas de commentaire