Daikin FTYN35DV3B ATY35DV2 Spécifications Page 96

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 128
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 95
SiBE01-503 Indoor Unit
Removal Procedure 87
4
Disengage the hooks of
the pipe retainer on the
back.
5
Pull auxiliary pipe
forward to an angle of
10 to 20 degrees.
Be careful to prevent pipe
deformation.
6
Disengage hooks
located right and left
side, and pull heat
exchanger forward.
The hooks are
symmetrically placed in
the right and the left.
Lift the heat exchanger
slightly upward to the right,
and the left hook comes to
be disengaged easily.
Step Procedure Points
Vue de la page 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 127 128

Commentaires sur ces manuels

Pas de commentaire